Frameless · Semi-frameless

Custom Glass
Shower Doors.

Frameless and semi-frameless enclosures, built to your bathroom — across Oakville, Burlington, Milton, Mississauga & the GTA. Same-day response, no-obligation quotes.

Templated on site, installed in one visit.

Every enclosure is fabricated in three stages. First, on-site templating — after your tile is installed, so the glass fits the wall as built, not as drawn. Second, the glass is cut and tempered and the hardware ordered. Third, professional installation, completed in a single visit.

Typical turnaround is five to seven business days from measurement to a finished, sealed shower.

Glass options

  • Clear tempered — the standard, crisp and bright
  • Low-iron (Starphire) — no green tint, true colour against marble and tile
  • Tinted — grey or bronze for warmth and privacy
  • Textured / frosted — full privacy without losing light
  • 3/8" (10mm) or 1/2" (12mm) tempered, depending on span and hardware

Configurations we install

  • Hinged doors — glass-to-wall or glass-to-glass
  • Pivot doors
  • Walk-in panels and screens
  • Corner and neo-angle enclosures
  • Tub enclosures
  • Sliding systems
Configurations

Built to the room,
not the catalogue.

Frameless walk-in shower with mosaic tile

Walk-in

A single fixed panel, no door, no track — the cleanest line a shower can have.

90-degree corner shower with black hardware

Corner & neo-angle

Two or three panels mitred into the corner — full enclosure, minimal hardware.

Glass tub door with brass hardware in a marble alcove

Tub enclosure

Fixed or hinged glass over the tub — the curtain rod retires for good.

Floor-to-ceiling steam shower enclosure

Steam shower

Sealed to the ceiling with a transom — holds the steam, not the moisture damage.

Double-door frameless shower with black hardware

Double door

Two hinged doors meeting in glass — wide, symmetrical, no centre post.

Custom angled shower glass under a sloped ceiling

Sloped & custom angles

Raked ceilings, knee walls, odd corners — the glass is cut to the room, whatever the room does.

FAQ

Questions, answered.

How long does a custom shower take?

Five to seven business days from measurement to install. We template after your tile is finished, fabricate, then install in one visit.

Can you handle condo-board approvals?

Yes. Paperwork, certificates of insurance and approvals are handled for you — your project clears the board without delays.

What glass thickness should I choose?

10mm (3/8") covers most enclosures; 12mm (1/2") for larger spans and heavier doors. All shower glass is tempered safety glass — we never temper anything 5mm or thinner, so thin glass never ends up where it doesn't belong.

What does the warranty cover?

Five years on workmanship, in writing — seals, hinges, alignment, the install itself. If something we did fails, we fix it.

Frameless ensuite shower against book-matched marble, 10 mm tempered — Toronto
PENCIL STUDYINSTALLED · TORONTO

Where we install

Oakville·Burlington·Mississauga·Milton·Hamilton·Toronto & the GTA

Ready to make it frameless?

Get a fixed, written quote from the owner — no pressure, no call centre.

Get a free quote
Get a Quote
Call 416-897-0767